Beyond The Grave

For reasons which were never adequately explained to me, when we had our extension built, Building Control forced us to have a soak away dug in the back garden rather than simply cut into the existing surface water pipe. The Soak Away’s job is to collect and disperse the run off water from the house and garden.
So we did what we were told and built a Soak Away as required. This meant digging a pit about 6 feet (182cm) deep and backfilling with shingle and stones.
One of the young labourers was tasked with the job and went about it with gusto. He did not use any power tools only a spade, a shovel and a pick axe, but by the end of the afternoon he was standing in a neat 6 foot square hole. The edges were lovingly finished, crisp, and the sides plumb.
I went out to have a natter with him and to take him a cup of tea. I praised him for his speedy work and in particular his tidy finish.
‘Ah yes’ he says. ‘I was grave digger in Poland’

© Andy Daly 2017